Yeniköy Thermal Power Plant Unit Works ANASAYFA / Yeniköy Thermal Power Plant Unit Works
Cleaning of 19616 condenser tubes with 1000 bar capacity water jet, checks of tubes with eddy current method and blinding of damaged tubes
- Employer: YK Enerji A.Ş.
- Location: Muğla
- Scope of Work: Condenser cleaning and control checks
- TYPE OF SECTOR: Energy
- Material Quality: CuZn20Al2